Construction Flexibility
Construction Flexibility

Building height, masonry opening sizes and plan revisions, small or large, are easily made in the field with masonry, as opposed to shop drawings and delivery for other systems including steel, precast and metal panel systems.

Height, window opening and plan revisions are easily accommodated on-site without costly delays and often without additional cost.

Construction can begin almost immediately with masonry, with products often available at hand. Early enclosure can allow other trades to work efficiently instead of waiting for delivery and erection of structural steel and precast exterior walls. While precast offers fast erection times, a masonry project could be enclosed before the precast arrives at the site.

Masonry does not require large staging areas for cranes or access for trucks delivering other materials.

Newsworthy - Published or Not

Related Links

YouTube Video of Winter Construction Set to Music
Masons, laborers and skilled operators are kept working in winter conditions down to 0 degrees Farenheit in this YouTube video composite of still photographs set to music.